Sky Train Corporation Test Model Photos:
Las Vegas APTA Expo 2002
Meeting of Monorail enthusiasts. President of the Monorail Society Kim is 2nd from right
At Largo Railroad - Curve Qualification
Measuring the safety limits of Sky Train's claims on curves. It is only using 62% of possible design of 10 degrees
Drawing of our 1/6
Drawing of the 1/6 operating model shown below
Wilfred joining the process of machining, de-burring and welding
Bruce & Karl during the mechanical assembly of rail cars to hang the monorail bodies
Side view of the assembled vehicle. The control for dynamic braking and air-brakes is in front